Why the Munitions Ramp-Up Needs Test Capacity

Written by Marketing Team | Oct 26, 2026, 11:43:48 AM

Return to Home>

Primes are quadrupling interceptor output. Every new line needs production-ready test systems to keep pace.

The U.S. is asking its munitions makers to build more, faster, than at any point in decades. The headlines are about interceptors and missiles.

The quieter story is everything a production line needs before a single round ships, starting with test.

The numbers are big. In early 2026, The Defense Post reported Lockheed Martin and the Department of War announced a framework agreement to raise PAC-3 MSE output from about 600 to roughly 2,000 interceptors a year over seven years. The two then signed a second agreement to take THAAD interceptor output from 96 to 400 a year, according to Lockheed Martin, which said the ramp would play out over about seven years.

On October 1, the Navy awarded Raytheon a five-year contract for SM-6 interceptors worth up to $24.4 billion, with two additional option years, Reuters reported. And on RTX’s second-quarter earnings call in July, CEO Chris Calio said Raytheon had “more than doubled year over year output across our critical munitions through the first half of the year.”

On that same call, Calio put the supplier’s side plainly. Give suppliers a seven-year firm order, he said, and “they will lean forward, they will make the investment,” bringing in tooling and test equipment and hiring ahead of demand. Test equipment is on that list for a reason.

Why Test Becomes the Bottleneck

When output triples or quadruples, every step of the line must scale with it. Machining, assembly, and energetics get most of the attention. Test is easy to overlook, because a test station looks like a fixed asset: you already have one, and it works.

But a test station has a fixed throughput. If one station can verify a set number of units per shift, and the line now builds three or four times as many, the math is simple. Either the program adds stations, or untested units stack up waiting.

Three things make test capacity hard to add quickly:

  • Test equipment is program specific. A tester for one munition's electronics is built to that program's interfaces, signals, and acceptance criteria. You can't buy a second one from a catalog.
  • The existing design may be old. Many fielded munitions are verified on test sets designed years or decades ago. Building a copy can mean chasing obsolete parts before the first new unit ships.
  • Lead times are already long. One report on the SM-6 agreement cites component lead times of up to 36 months. Test equipment competes for many of the same electronic parts.
  • No requalification of a new design. The new station matches the one already in use, so the program isn't validating a different tester mid-ramp.
  • The prime's engineers stay on the program. A build-to-print partner handles procurement, assembly, wiring, and checkout from the existing data package.
  • Problems get caught on paper. An experienced build-to-print team reviews the drawing package before building, flags parts that are obsolete or don't match the bill of materials, and raises them with the customer early.
  • Have you built defense test systems before, to someone else's print? Ask for specific programs or project types, not general claims.
  • Can you handle the whole station? Test hardware, cabling, load boxes, panels and PCAs from one supplier means fewer handoffs and one point of accountability.
  • How do you handle obsolete parts? A supplier with design engineers and a broad supplier network can propose approved substitutes instead of stopping the build.
  • Are you ITAR compliant and current on cybersecurity requirements? Confirm ITAR registration, CMMC status, counterfeit part prevention and AS9100 certification.
  • Can you scale from one unit to many? A ramp may start with a single station and grow to several. The supplier should handle both.
  • How will you communicate? Look for a named engineering contact, regular status updates, and fast notice of any change that affects cost or schedule.
  • Military ordnance test systems
  • Automated flight termination unit test systems
  • Bomb armament test support
  • Gun range test systems for fighter aircraft and infantry support
  • Test sets used to calibrate military aircraft
  • Legacy flight recorder test equipment
  • Modular load boxes for aerospace and defense

The result: a program that funds new production capacity but treats test as an afterthought can end up with a line that builds faster than it can verify.

What a New Production Line Needs

"Test capacity" is rarely one box. A new or expanded line typically needs a set of equipment; each piece built to the program's drawings:

Equipment

What it does on the line

Production-ready test systems

Verify each unit's electronics before it moves on, often rack-mounted and integrated with test software

Electrical load boxes

Simulate the loads a unit's circuits will see in use, so outputs can be verified safely on the bench

Custom cable and wiring harness assemblies

Connect the unit under test to the tester, often with program-specific pinouts and connectors

Test fixtures and interface hardware

Hold and connect the unit repeatably, shift after shift

Control panels and test cabinets

House and route power, signals and safety interlocks

Printed circuit assemblies

Interface and signal-conditioning boards inside the tester

Each item must match the existing station exactly, so results from the new line can be trusted alongside results from the old one. That's the core requirement of a ramp: more of the same, built the same way.

Why Build to Print Fits a Production Ramp

In a ramp, the prime already owns a proven test design. What it lacks is capacity: engineering hours, floor space, and skilled technicians to build more stations while its own people focus on the weapon itself.

That's exactly what build to print provides. Unlike build to spec, where a supplier designs to a performance requirement, build to print means the customer owns the design and the supplier builds exactly what's drawn. For a prime adding test stations, that has three advantages:

Some defense primes say they are adding second and third sources where production is still constrained and looking beyond the traditional defense industrial base for manufacturers. Test equipment is a natural place to start: the design exists, and a capable defense build-to-print manufacturer can add capacity without adding risk.

What to Look for in an Electronic Test Equipment Supplier

If your program is adding test capacity for a munitions ramp, here's what to ask a prospective supplier:

Ball Systems: test capacity for defense programs

Ball Systems has spent 60 years manufacturing electrical and electronic test systems, and much of that work has been for defense. As a defense build to print manufacturer, we've completed projects including:

We build production-ready test systems and the assemblies inside them, including custom cable and wiring harness assemblies, load boxes, control panels and PCAs, in quantities from a single system to thousands of assemblies a year. Customers include Boeing, V2X, Honeywell, Collins Aerospace, the U.S. Navy and the U.S. Air Force.